{"id":2967,"date":"2020-12-01T22:37:50","date_gmt":"2020-12-01T22:37:50","guid":{"rendered":"https:\/\/houss.org\/?p=2967"},"modified":"2021-05-19T17:09:56","modified_gmt":"2021-05-19T17:09:56","slug":"crane-removal-at-houss","status":"publish","type":"post","link":"https:\/\/houss.org\/crane-removal-at-houss\/","title":{"rendered":"Removal of the Construction Crane"},"content":{"rendered":"
It has been a busy few weeks at HOUSS<\/strong>. With occupancy scheduled for Summer 2021, the project has reached a major construction milestone with the removal of the construction crane. As seen in the timelapse below, our on-site team of trained rigging professionals utilized a large mobile crane to carefully disassemble individual sections of the tower crane.<\/p>\n <\/p>\n